Categories
Articles Construction Project References

Test Touch Voltage Membrane LRT Kelapa Gading

PROYEK LRT PHASE 1 KELAPA GADING VELODROME RAWA MANGUN

APLIKASI TOUCH VOLTAGE MEMBRANE DAN CONTROL JOINT

VOLUME                                   : 2,400 M²

KONTRAKTOR        : PT. WIJAYA KARYA (Tbk)

Leave a Reply

Your email address will not be published. Required fields are marked *

Chat via WA
Anda butuh bantuan?
Hello,
Apa yang bisa kami bantu?